PROJECT INFORMATION
CORAM QUEEN ELIZABETH II CENTRE
Coram Campus. 41 Brunswick Square. London WC1N 1AZ.
Completion due October 2018
Cost: £5.5 million
Client: Coram Foundation
Architects: Philip Meadowcroft Architects
Phil Meadowcroft, Chris Nash, Nurit Moscovici-Amar, Daniel Diaz Monterrubio, Willemijn van de Klundert, Callum Rae.
Project manager: Gleeds
Structural Engineers: Price and Myers
M&E Engineers: J Noad Limited
Cost Consultant: Gleeds
Acoustics: EEC Limited
Landscape Design: Philip Meadowcroft Architects
Arboriculturalist: Raphael Skerratt
Contract: Design Build
Contractor: Thomas Sinden
Contractors Architects: Frankhams
Photography: Philip Meadowcroft
2003 – 2013 Meadowcroft Griffin Architects (MGA)
PM Phil Meadowcroft (Director)
AG Ann Griffin (Director)
HB Hugo Braddick (Director 2007 - 2013)
CC Catriona Casey (Associate)
EE Esther Everett (Associate)
EK Elizabeth King (Associate)
JM Jane MacCuish (Associate)
JB Jennifer Bull
MC Marta Castillo
GD Geraldine Dening
HE-T Hadas Even-Tzur
RF Rebecca Fode
AH Adam Holland
JH Jamie Hughes
NH Nike Himmels
SH Sarah Habershon
TJ Tommy Jay
ZK Zak Keene
SL Sam Levine
SM Simon Mellor
PQ Patrick Quinn
JS John Stiles
RS Rachel Sykes
PT Patrick Toff
DVK Dennis Van Kampen
Notes:
(D) Denotes Project Director
(P) Denotes Project Architect
* As part of MGA’s dissolution, Ann Griffin requested that the full description of her role as co-director should be as follows:
Lauriston School: “By Meadowcroft Griffin Architects. By Ann Griffin of Meadowcroft Griffin Architects; Ann Griffin, Project Director and lead designer”.
Stanley School: “By Meadowcroft Griffin Architects; Ann Griffin, Project Director and lead designer; Philip Meadowcroft and Hugo Braddick, Directors and design support”